Skip to content
Capabilities / Spec Sheet 04-A

5-axis capacity, tolerances, and lead times — on one page, in tabular form.

Quote returned in under 6 hours for files under 50 parts. Standard-tolerance parts ship in a median of 4.2 business days; ±0.0005" ultra-precision work in 6.8. Bookmark this page; it's the spec sheet you check before you upload STEP or IGES.

  • Rev.04-A · 2025
  • FormatDFM-ready STEP/IGES
  • AuditAS9100D · ISO 9001:2015
§ 01 · Machine Roster

The cells that cut your parts.

Every CNC platform in the Long Beach and Phoenix shops, with work envelope, axis count, spindle, and verified daily throughput. If your part fits a Hermle C42U envelope and a 0.5 mm end mill, we can cut it on the same quote.

Cell Platform Axes Work Envelope (mm) Spindle Daily Throughput Shift Pattern
LB-A1 Hermle C 42 U 5-axis Ø 700 × 500 18,000 rpm · HSK-A63 22 parts/day Lights-out, since 2017
LB-A2 DMU 50 (2nd Gen) 5-axis Ø 500 × 400 20,000 rpm · HSK-A63 18 parts/day Lights-out, since 2017
PHX-A3 DMU 65 monoBLOCK 5-axis Ø 650 × 560 18,000 rpm · HSK-A100 15 parts/day 2-shift, opened 2023
LB-B1 Haas VF-2 SSYT 3+2 (5-axis trunion) 762 × 406 × 508 12,000 rpm · BT/CT-40 34 parts/day 2-shift, lights-out windows
  • Max part weight320 kg static fixtured · 28 kg dynamic trunion
  • Smallest reliable feature0.5 mm end mill, 0.8 mm wall stock on aluminum
  • CoolantThrough-spindle 80 bar on all 5-axis cells
  • VerificationCalibrated quarterly against Renishaw OMP60 probes, OMV 6.6
§ 02 · Stocked Materials

Bar stock on the floor, not on a sourcing call.

14 alloys held in a 14,000 sq ft climate-controlled shop in Long Beach, with backup inventory in Phoenix. Same-day shipping on the four alloys in bold; everything else ships inside the standard lead-time band.

Aluminum

Same-day ship
AlloyTemperFormStock Range
6061-T6T6Plate, bar, billet3 mm — 150 mm
7075-T7351T7351Plate, bar6 mm — 100 mm
2024-T3T3Sheet, bar1.6 mm — 75 mm
MIC-6 cast tool & jig platePlate12.7 mm — 76.2 mm

Stainless & Carbon Steel

Same-day ship on 303 / 304
AlloyTemperFormStock Range
303AnnealedRound bar, hexØ 6 — 102 mm
304AnnealedRound bar, plateØ 6 — 75 mm · plate to 25 mm
316 / 316LAnnealedRound barØ 6 — 75 mm
1018 / 4140HR / annealedRound bar, plateØ 6 — 150 mm

Brass, Copper, Bronze

Same-day ship on C360
AlloyTemperFormStock Range
C360 brassH02Round barØ 3 — 102 mm
C110 copperH04Bar, sheetØ 6 — 50 mm
C932 bronzeCastRound barØ 12 — 150 mm
C954 aluminum bronzeCastRound barØ 25 — 200 mm

Plastics & Composites

Sourced 1–3 days
MaterialFormStock RangeNotes
Delrin / POM-HSheet, rod3 — 75 mmMachinable, FDA grades on request
PEEK (virgin & bearing)Rod, plate6 — 50 mmAerospace-grade lot traceability
UHMW-PESheet, rod3 — 100 mm
G10 / FR4Sheet0.8 — 25 mmNEMA-grade electrical insulation
§ 03 · Tolerance Tiers & GD&T Envelope

Four named tiers. Pick the one that matches your print.

Every quote is reviewed by a senior CNC programmer who flags wall-stock, tolerance, and GD&T issues inside the quote — not after. The tier you choose here is the tier we hold on the first article and the production run.

Tier 01

Standard

Default — no add cost
Linear
± 0.005"
Bore diameter
± 0.005"
GD&T capability
Position ≤ 0.010", GD&T per ASME Y14.5-2018
Surface finish
Ra 1.6 µm / 63 µin
Median lead time
4.2 business days

Best fit: brackets, enclosures, prototype chassis, structural components.

Tier 03

Ultra-Precision

Hermle-only
Linear
± 0.0005"
Bore diameter
± 0.0005"
GD&T capability
Position ≤ 0.002", profile ≤ 0.0015", cylindricity held to 0.001"
Surface finish
Ra 0.4 µm / 16 µin
Median lead time
6.8 business days

Best fit: aerospace rotor hardware, semiconductor fixturing, surgical-device sub-assemblies.

Tier 04

Inspection-Grade

FAIR + AS9102
Linear
± 0.0002" (on quoted datums)
Reporting
Full FAIR / AS9102 dimensional report included
Measurement
CMM with Zeiss Contura + Renishaw Equator gage R&R study
Surface finish
Profilometer traces included in report
Median lead time
9.5 business days

Best fit: defense and aerospace flight hardware, ITAR-registered work.

§ 04 · Finishes & Secondary Services

One supplier through final finish. No second handoff.

Anodizing, passivation, heat-treat, laser marking — sourced from NADCAP-accredited partners under our own release orders. Every finish adds a verified lead-time delta to the tier above.

  • Type II & III Anodizing

    Aluminum; sulfuric (Type II) and hard-coat (Type III). Class 1 & 2 dyed colors on request.

    Spec
    MIL-A-8625
    Add to lead time
    + 2 business days
    Lot size
    to 600 × 800 mm
  • Passivation

    303, 304, 316 stainless; nitric and citric chemistries per ASTM A967.

    Spec
    ASTM A967, AMS-QQ-P-35
    Add to lead time
    + 1 business day
    Lab cert
    included
  • NADCAP Heat-Treat

    Aluminum T6/T7, stainless solution anneal, 4140 through-hardening.

    Spec
    AMS 2770, AMS 2750
    Add to lead time
    + 2 business days
    Accreditation
    NADCAP (held)
  • Bead Blast, Black Oxide, Laser Mark

    Surface prep, MIL-DTL-13924 black oxide, and fiber-laser marking/UID per MIL-STD-130.

    Bead blast
    + 0.5 day · glass or aluminum media
    Black oxide
    + 1 day · steels & stainless
    Laser mark
    + 0.5 day · UID compliant
§ 05 · Lead-Time Service Lanes

Three lanes. One shop floor.

Pick the lane that matches your schedule. All three run on the same 5-axis cells and the same engineering review desk — the difference is how aggressively we book the calendar.

Lane A

Standard

× 1.0 multiplier

Median turnaround
4.2 business days
Tolerance ceiling
± 0.0005" (Ultra-Precision tier)
Quote turnaround
Same business day, by EOD
Order cutoff
3:00 PM PT for next-day start
Best for
Production runs, pilot builds, and stock replenishment
Pick Standard
Lane B

Quote in 6 Hours

× 1.18 multiplier

Median turnaround
4.5 business days (cutting)
Tolerance ceiling
± 0.0005" (Ultra-Precision tier)
Quote turnaround
< 6 hours, files < 50 parts
Order cutoff
12:00 PM PT for same-day start
Best for
Mechanical reviews and engineering-build milestones where the schedule slipped
Pick 6-Hour

Verified across 18,400+ RFQs in 2024.

Lane C

Lights-Out Rush

× 1.45 multiplier

Median turnaround
2.1 business days
Tolerance ceiling
± 0.002" (Precision tier)
Quote turnaround
Within 90 minutes, 24/7 on-call desk
Order cutoff
Continuous — Hermle cells run overnight
Best for
Live test stands, demos, and investor-day builds
Pick Lights-Out